Miskan Al Asala
18 Apr 2026

Al-Asalah

62%Overall▲ +2% · vs previous visit

Main video

Engineering Report

The project shows significant progress in the concrete structures and exterior boundary walls of the villas. Most of the structural frameworks for the buildings have been cast, with a clear start on roof waterproofing (bitumen) and the installation of some perimeter fencing for the units. The site is witnessing active movement of equipment and labor to complete backfilling and leveling works around the buildings.
Detected changes
Villa Rooftops95%

Blue and black waterproofing layers are visible on the roofs of numerous units

External Fences90%

Completion of boundary walls between residential units across several blocks

Site Works95%

Progress in internal road grading and soil leveling around the foundations

Structural Frameworks85%

Completion of concrete pouring for the roof parapets of the villas

Progress reading

Although the previously recorded percentage was 0%, the current images reflect an advanced execution reality that exceeds the structural skeleton stage in large parts of the project, as waterproofing and initial exterior finishing works have already commenced.

vs previous visit

Compared to the previous site visit photos, there is a noticeable increase in the number of units with completed roof insulation, progress in the construction of external boundary walls that were previously incomplete, and an improvement in general site organization with the removal of construction debris from pedestrian walkways.

Expected next milestones

Commencement of external plastering works, installation of windows and doors, and completion of infrastructure piping for internal roads.

Progress

0%OverallAverage item progress
0/4 completeavg ▲ +1%
Finishing Works▲ +1%
0%
Fences and Courtyardsnew
0%
Structural Frameworknew
0%
Foundationsnew
0%

Zone 1

Zone 2

Zone 3

Models

Model R1

Model R2

Model R3