Miskan Al Ghuroob
19 May 2026

Al-Ghuroob

62%Overall▲ +4% · vs previous visit

Main video

Engineering Report

The report shows significant progress in infrastructure works and general site landscaping, with ongoing work on the concrete structures of the residential units. Progress has been noted in the asphalt paving of internal roads and the preparation of main pathways between residential blocks.
Detected changes
Internal Roads95%

Completion of initial asphalt works for the road network surrounding the residential units and demarcation of sidewalks.

Structural Framework90%

Continuation of concrete pouring for slabs and columns across several units, with visible progress in masonry work using cement blocks.

General Site85%

Organization of the staging area and temporary offices, with an increased pace of equipment movement (concrete pumps and transport trucks).

Progress reading

Although the recorded percentages indicate 0%, the photos clearly demonstrate substantial completion of the structural framework (skeleton) and tangible development in general site works and paving. This necessitates an update to the completion percentages to reflect the actual reality shown in the images.

vs previous visit

Compared to the previous visit, we observe a transition from dirt roads to fully paved roads, an increase in the number of units with completed structural frameworks, and improved overall site organization and material distribution.

Expected next milestones

Commencement of external plastering works, installation of preliminary mechanical and electrical systems, and completion of the units' perimeter walls.

Progress

0%OverallAverage item progress
2/4 completeavg ▲ +2%
Finishing Works▲ +3%
0%
Fences and Yards▲ +3%
0%
Structural Framework
0%
Foundations
0%

Site (360)